project05:W1

From rbse
Revision as of 18:59, 12 October 2016 by Nick (Talk | contribs)

Jump to: navigation, search


Nick van Dorp

Design objective: Build any given volume with cubes; Determine the order in which they can be stacked and determine the shortest possible path they should follow to reach their position.

Design strategy: Use anemone to build the volume step by step. Use closest points to construct a network of possible paths. Choose shortest route with 'shortest path' plugin.

GH-script: Nvandorp_w1.gh

In the gif you can see the volume being constructed out of cubes like it is growing. The blue line indicated the shortest path:

Nvandorpw1animation.gif

Computational Flow Diagram:

Nvandorpw1strategy.jpg